Case Study: Creating a Safe & Stable Welfare Area in Cambridgeshire
A construction contractor working on a major infrastructure project in Cambridgeshire needed a stable, level surface to accommodate a welfare unit for on-site workers. The ground conditions were soft and prone to waterlogging, making it unsuitable to place the unit directly on the existing surface.

The Challenge
The site required:
- A stable, load-bearing surface capable of supporting a welfare cabin and associated equipment
- Quick installation to avoid delays to the project programme
- A solution that could be removed cleanly without damage to the ground beneath
Our Solution
GT Trax deployed a configuration of PowerTrax 60 (Signaroad) panels to create a firm, level pad across the target area. The interlocking panels distributed the weight of the welfare unit evenly, preventing sinkage and ensuring the cabin remained level throughout the project duration.
Our site crew completed the installation in a single day, with no disruption to other on-site activities.
The Result
The welfare unit was successfully installed on the pad and remained stable for the full duration of the project — several months — through some of the wettest weather of the winter. When the project concluded, the panels were uplifted cleanly, leaving the ground in its original condition.

"GT Trax turned up on time, got it done quickly, and the pads held up perfectly throughout. No issues at all — we'll definitely be using them again." — Site Manager, Cambridgeshire
Products Used
- PowerTrax 60 (SignaRoad) — heavy-duty aluminium trackway panels providing stable, load-bearing surfaces for welfare units and site compounds
Why GT Trax Was Chosen
The GT Trax team was selected for this project because of our proven track record in construction infrastructure projects, our ability to deliver and install within a single day to avoid programme delays, and our commitment to providing solutions that leave the ground in its original condition. We worked closely with the site management team throughout to ensure the pad configuration supported the welfare unit safely for the full project duration.
Contact us to discuss your welfare area or site compound requirements.